Energie « Terug naar discussie overzicht

Windpower - Europe

2.053 Posts, Pagina: « 1 2 3 4 5 6 ... 97 98 99 100 101 102 103 » | Laatste
voda
0
Ørsted and Vestas Forge Sustainable Partnership for Offshore Wind

Strategic Research Institute
Published on :
8 Jun, 2023, 7:03 am

In a significant move towards sustainable energy, Ørsted and Vestas, global leaders in renewable energy, have announced a commercial sustainability partnership. The partnership entails the procurement of low-carbon steel wind turbine towers and blades made from recycled materials from Vestas for all future joint offshore wind projects.

The deployment of offshore wind plays a crucial role in enhancing energy security, ensuring affordable energy access, and combating the climate crisis. While wind energy already offers a 99% lower carbon footprint compared to coal, it is essential to address the carbon emissions associated with the manufacturing of materials and components used in wind farms as part of the journey to achieve net-zero emissions.

To meet this challenge, Ørsted and Vestas have committed to installing low-carbon steel towers and blades made from recycled materials in all upcoming joint offshore wind farms. This partnership establishes a sustained demand for Vestas' innovative low-carbon and circular solutions.

Mads Nipper, Group President and CEO of Ørsted, emphasizes the significance of partnerships and collective action in tackling climate change. The collaboration with Vestas allows for the integration and scaling of cutting-edge decarbonization and circularity solutions to meet the evolving customer demands for net-zero wind farms. Nipper urges decision-makers worldwide to join the effort and drive demand for low-carbon and circular solutions within the renewable energy sector.

Henrik Andersen, CEO of Vestas, highlights the need for strong partnerships and collaboration to accelerate the energy transition successfully. The partnership with Ørsted expedites the deployment of Vestas' circular blade recycling technology and fosters the demand for low-carbon steel in the wind industry's supply chain. This collaboration sends a powerful message about the importance of commercial agreements and collective action in the urgent fight against the climate crisis.

The partnership commits to procuring a minimum of 25% low-carbon steel towers and scaling circular blade recycling technology for all joint future offshore wind farms. Vestas has been at the forefront of cross-industrial collaboration to establish the availability of low-carbon steel for wind turbine towers. By utilizing scrap steel manufactured with on-site renewable electricity, carbon emissions from heavy steel plates used in towers can be reduced by up to 70%.

Vestas and its partners in the CETEC project have also made significant progress in addressing the circularity challenge of wind turbine blades. They have pioneered a solution to break down composite materials and reuse recovered epoxy resin for new blades, thus reducing the need for landfilling. Ørsted will procure wind turbine blades made from recycled materials from Vestas once the technology is ready for commercial manufacturing.
voda
0
RWE Assumes Sole Ownership of German Offshore Wind Cluster

Strategic Research Institute
Published on :
7 Jun, 2023, 7:11 am

RWE, a renowned global player in the offshore wind sector, has taken a significant stride in fortifying its presence in the German offshore market. The company has assumed full ownership of the Nordseecluster, a cluster of offshore wind farms with a combined capacity of 1.6 gigawatts (GW) located in the German North Sea. Previously co-developed with Canadian company Northland Power, RWE has acquired Northland Power's 49% shareholding in the cluster for a purchase price of approximately €35 million.

By becoming the sole owner of the Nordseecluster, RWE aligns with its ambitious goal of further expanding its position as a global leader in offshore wind. As Germany's first gigawatt-scale offshore wind cluster, it grants RWE substantial size and scale. Upon the operationalization of the Nordseecluster in 2027 and 2029, RWE will play a pivotal role in Germany's decarbonization efforts by generating approximately six terawatt hours of green electricity annually. Looking ahead, RWE aims to participate in the upcoming large German offshore wind auctions later this year, reinforcing its commitment to renewable energy development.

The development of the Nordseecluster will occur in two phases: Nordseecluster A and B. Currently, two wind farms (N-3.8 and N-3.7) forming Nordseecluster A, with a combined capacity of 660 megawatts (MW), are in the permit application phase. Offshore construction for Nordseecluster A is anticipated to commence in 2025, with commercial operations expected to begin in early 2027. The second phase, Nordseecluster B, will comprise two additional wind farms (N-3.6 and N-3.5), contributing an additional 900 MW of capacity starting from 2029. RWE plans to participate in the German government's offshore wind auctions this year for both sites of Nordseecluster B, exercising its step-in rights.

RWE has already selected preferred suppliers for the main components of all four sites, with Vestas contracted to deliver 104 offshore wind turbines, each with a capacity of 15 MW. The company anticipates significant economies of scale and synergies throughout the development, construction, and operation phases of the Nordseecluster. Additionally, RWE will leverage its comprehensive in-house capabilities to provide customized green solutions, supporting the decarbonization efforts of industrial and municipal customers.

Remarkably, the Nordseecluster will be in close proximity to the existing Nordsee One wind farm, a joint operation between RWE and Northland Power, with a capacity of 332 MW. By capitalizing on the synergies between these neighboring wind farms, RWE aims to maximize the efficiency and effectiveness of its operations in the region, further advancing the transition to a sustainable and carbon-neutral future.
Bijlage:
voda
0
ABP Supports Ripple Energy's Project with Wind Turbine Blades

Strategic Research Institute
Published on :
9 Jun, 2023, 4:30 am

Associated British Ports (ABP), a prominent ports group in the UK, has welcomed the arrival of wind turbine blades and tower sections for Ripple Energy's Kirk Hill Wind Farm at the Port of Ayr. This project marks a significant milestone in the country's transition towards renewable energy, providing sustainable power to thousands of households and businesses.

The importation of all eight turbines was efficiently completed within a month, with four general cargo ships delivering the components to the Port of Ayr between the 8th and 29th of May. These components will remain at the port until they are ready to be transported to the wind farm site near Kirkoswald.

Ripple Energy offers a unique opportunity for individuals and businesses to own a share of large-scale wind farms and solar parks, enabling them to access their own source of green electricity. The Kirk Hill Wind Farm is Ripple Energy's second project and is expected to be the largest consumer-owned wind farm worldwide. Once operational, the wind farm will consist of eight turbines capable of generating electricity to power a typical home for an entire year in just under 10 minutes, while also reducing annual CO2 emissions by 31,760 tonnes.

Sarah Merrick, Founder and CEO of Ripple Energy, expressed delight at achieving this significant milestone in the Kirk Hill project. She commended the precision and expertise displayed by ABP's skilled team, as well as the collaboration with crane operators from Forsyth and hauliers from Collett in handling the discharge of such large cargo from the vessels.

Andrew Harston, Regional Director for Wales and Short Sea Ports at ABP, emphasized the company's commitment to supporting the UK's energy transition. ABP has set its own goal of becoming a Net Zero business by 2040 and actively assists customers in achieving their decarbonization objectives. Collaboration is key to achieving these ambitious goals, and ABP is pleased to work with Ripple Energy in developing new energy infrastructure in Scotland.

ABP's Port of Ayr's involvement in this project follows its recent support for Vattenfall's South Kyle wind farm, which comprises 50 turbines spanning East Ayrshire and Dumfries and Galloway. These initiatives underscore ABP's dedication to facilitating the delivery of renewable energy projects and contributing to a greener future.
Bijlage:
voda
0
‘Windparken verstoren groei plankton en daarmee voedselketen op de Noordzee’

Windturbines lijken de groei van plankton te verstoren in bepaalde gebieden op de Noordzee. Dat vormt een risico voor de voedselketen op zee. Die waarschuwing uiten onderzoekers zaterdagavond in een uitzending van wetenschapsprogramma Focus op NPO 2.

Fytoplankton vormt de basis van het mariene voedselweb, zegt Luca van Duren, hoofdonderzoeker van kennisinstituut Deltares. Als daar iets mee gebeurt, kan dat effect hebben op al het leven in de zee. ,,Dus als je op veel plekken een negatieve impact hebt, moet je je wel heel goed afvragen waar je mee bezig bent’’ zegt Van Duren in het NTR-programma.

Ook over het effect van stroomkabels op embryo’s van haaien en roggen bestaan zorgen, net als over het geluid van het heien voor duizenden nieuwe turbines. Maar de uitrol van windparken gaat veel sneller dan onze kennistoename over die ecologische impact. Hobbelt het onderzoek achter de ambities aan? ,,Ja, dat gevoel heb ik wel”, zegt Jeroen Hubert, gedragsecoloog van de Universiteit Leiden.

Husselen
Door de zeestroming langs de palen waarop windparken zijn gebouwd, husselen de verschillende lagen van koud en warm zeewater meer door elkaar dan normaal. Op de ene plek krijgen algen daardoor meer voeding, maar op andere verschijnt meer slib in de bovenlaag en remt de groei van plankton.

,,De Duitse bocht is ons zorgenkindje’’, zegt Van Duren. ,,Dat is waar ik mij persoonlijk de meest zorgen maak om dit soort effecten.” Eén van de opwekkers van stroom in het gebied is het Gemini Windpark, op minder dan 100 kilometer ten noorden van Groningen. Met name de Duitse overheid wil in het gebied nog veel meer parken laten bouwen.

De aanleg van duizenden kilometers stroomkabel, om de groene stroom aan land te brengen, is evenmin zonder risico's. Haaien en roggen zijn gevoelig voor elektromagnetische velden. Ze gebruiken ze deels voor het speuren naar voedsel. Mariene ecoloog Annemiek Hermans onderzoekt op de Wageningen Universiteit of kabels de embryo's van de hondshaai kunnen verstoren.

Hermans ziet effecten, maar ze kan nog niet zeggen of het om kleinschalige verstoringen gaat. Ze stelt ‘fan te zijn van groene energie’, maar ziet tegelijkertijd een spanningsveld. ,,Het kan niet zo zijn dat we straks alle kabels hebben neergelegd en er dan achter komen dat we ze anders hadden moeten ontwerpen.”

We moeten de ecologi­sche impact van windparken veel beter onderzoe­ken. Of willen we het risico lopen dat we straks al onze vis uit Aziatische kwekerijen moeten halen?

Albert Jan Maat, Voorzitter NetVisWerk
Vissers zijn gealarmeerd over de waarschuwingen van wetenschappers. ,,Er is voortdurend aandacht over het effect van bodemberoering door de visserij. Maar deze zaken blijven onderbelicht”, zegt Albert Jan Maat, voorzitter van visserijorganisatie NetVisWerk tegen deze site.

Maat: ,,We moeten de ecologische impact van windparken veel beter onderzoeken. Of willen we het risico lopen dat we straks al onze vis uit Aziatische kwekerijen moeten halen?” Tot 2050 moet de opwekcapaciteit van windparken op zee worden vervijftienvoudigd tot 70 gigawatt.

Het is niet de eerste keer dat wetenschappers aandacht vragen voor de schaduwzijde van duurzame energie op de Noordzee. Eerder schatten Wageningse onderzoekers dat er straks jaarlijks duizenden Jan-van-Gents zullen overlijden door botsingen met turbines. Maar er zijn ook studies die wijzen op windturbines als nieuwe leefplekken voor mosselen en andere weekdieren.

Aan de TU Delft wordt gezocht naar een manier om de palen voor windturbines op een geluidsarme manier de zeebodem in te krijgen. Nu gebeurt dat door ze er als het ware in te hameren, met alle herrie en schade voor zeeleven tot gevolg.

Champagnefles
,,Het probleem met de palen is dat ze veel groter worden dan we hadden voorzien”, zegt de Delftse ingenieur Andrei Metrikine in de NTR-uitzending. Ze hebben een doorsnee van wel 10 meter. En dat moet dan 100 meter de grond in.

Een nieuwe methode van draaien en trillen lijkt voor veel minder geluidsoverlast te zorgen. Metrikine kwam op het idee door aan de kurk van een champagnefles te denken. Ook die komt er draaiend het beste uit. Er worden al proeven gedaan met de nieuwe techniek.

Niemand van de onderzoekers vraagt overigens om te stoppen met de bouw van windparken op zee. Iedereen erkent dat windparken op zee één van de weinige technieken zijn om fossiele brandstoffen te vervangen door een CO2-vrije stroomvoorziening. Van Duren: ,,Maar met onderzoek moeten we proberen de effecten [op de natuur, red.] te verminderen.”
voda
0
EIB Supports EVN AG's Green Loan for Wind Farms

By Strategic Research Institute on Jun 14, 2023 10:56 am

In a resounding demonstration of commitment to renewable energy, the European Investment Bank (EIB) has extended a €110 million loan to EVN AG, a distinguished energy and environmental services provider in Lower Austria. EVN AG's ambitious plan involves the development of wind farms, harnessing the power of nature to generate clean electricity. This investment aligns seamlessly with Austria's climate action goals and contributes to the REPowerEU plan, a bold initiative aimed at reducing dependence on fossil fuel imports.

EVN AG, renowned for its hydropower, wind, and solar energy initiatives, has emerged as a frontrunner in the pursuit of sustainable electricity generation. By leveraging its subsidiary evn naturkraft Erzeugungsges.m.b.H, EVN AG has the capacity to supply approximately 590,000 households with green electricity. This remarkable feat mitigates an astounding 1.1 million tonnes of CO2 emissions annually, underscoring the company's commitment to combating climate change. The latest investment program will empower EVN AG to further expand its wind and solar energy portfolio.

The wind farms backed by the EIB loan are set to play a pivotal role in Austria's National Energy and Climate Plan (NECP). The country has set a remarkable target of generating 100% of its electricity from renewable sources by 2030. EVN AG's wind farm projects, scheduled for completion by early 2025, embody the nation's determination to achieve this ambitious goal. Notably, this investment marks EVN AG's fifth collaboration with the EIB and represents the first project to qualify as a green loan.

Beyond Austria's boundaries, this investment contributes significantly to the REPowerEU plan. By bolstering clean energy financing, the EIB is actively working towards reducing the European Union's reliance on Russian gas and oil. With an additional commitment of €30 billion, the EIB is poised to unleash the full potential of clean energy lending. The magnitude of these investments is projected to mobilize an impressive €115 billion in additional funding, propelling Europe towards energy independence.

Thomas Östros, Vice-President of the EIB overseeing projects in Austria, commends EVN AG's dedication to accelerating the transition towards greener power generation. As the EU climate bank, the EIB remains committed to supporting the development and implementation of renewable energy technologies. EVN AG's ambitious rollout program serves as a testament to the green energy transition's importance, aligning with the EIB's top priority.
voda
0
Sweden's Ambitious Triton Offshore Wind Farm Gains Approval

By Strategic Research Institute on Jun 14, 2023 10:44 am

In a momentous development, OX2 and Ingka Investments have set their sights on the Triton offshore wind farm in Sweden, with construction expected to commence by 2027. The project received the green light from the local government in Skåne, paving the way for a remarkable renewable energy endeavor. Situated 23km off the coast of Skåne, the wind farm aims to install up to 129 turbines, reaching a towering height of 370m. Once operational, this ambitious initiative is anticipated to generate approximately 1.5GW of electricity, sufficient to power half a million households in the county.

Emelie Zakrisson, the head of offshore wind development for OX2, expressed enthusiasm in a press statement, stating, "We eagerly anticipate the realization of this project and continued collaboration with local stakeholders. We are concurrently working to secure cable connections to the grid and finalizing agreements with suppliers to expedite the start of construction once all permits are in place."

Frederik de Jong, head of renewables at Ingka Investments, shared in the excitement, saying, "We celebrate the county board's green light for the project. Collaborating with OX2, we look forward to realizing the Triton offshore wind farm. With streamlined permit processes, the wind farm could begin producing clean electricity before 2030."

Triton represents one of three projects being developed jointly by OX2 and Ingka Investments in Sweden. Galene, situated along the west coast and recently approved by the government, and Aurora, located between the islands of Gotland and Öland, are the other two projects. Combined, these ventures boast a capacity of approximately 4.5GW, accounting for nearly 20% of Sweden's existing installed capacity.

As the global shift towards sustainable energy gains momentum, the Triton offshore wind farm is poised to play a significant role in Sweden's renewable energy landscape. The country's commitment to a greener future aligns with its ambition to reduce carbon emissions and enhance energy sustainability.
voda
0
TotalEnergies Spearheads Kazakhstan's Renewable Energy Transition

By Strategic Research Institute on Jun 14, 2023 10:40 am

TotalEnergies, an energy leader on the global stage, reaffirms its dedication to the energy transition in Kazakhstan through the signing of a groundbreaking Power Purchase Agreement (PPA) for the Mirny project. This milestone marks the first PPA of such magnitude for a wind initiative in the country.

Situated in the Zhambyl region, the project aims to construct a 1 GW onshore wind farm accompanied by a 600 MWh battery energy storage system, ensuring a reliable power supply. With an investment of approximately $1.4 billion, this venture exemplifies TotalEnergies' capacity to expedite the advancement of renewable energy in oil and gas nations, following its successful endeavors in Iraq.

The entirety of the electricity generated by the Mirny project will be sold to the Financial Settlement Center of Renewable Energy, a government-owned entity responsible for supplying the national grid in Kazakhstan. This project will provide electricity to approximately 1 million people.

The agreement was signed in Astana between Total Eren, an affiliate of TotalEnergies, and the FSC, in the presence of Patrick Pouyanné, Chairman and CEO of TotalEnergies, and Almasadam Satkaliyev, the Minister of Energy and Mineral Resources of the Republic of Kazakhstan. TotalEnergies will collaborate with the National Wealth Fund Samruk-Kazyna and the National Company KazMunayGas, each holding a 20% stake in the project.

Patrick Pouyanné, Chairman and CEO of TotalEnergies, conveyed his pride in spearheading the energy transition in Kazakhstan and lauded the Mirny project as an innovative endeavor. This wind and battery project will enhance the stability and resilience of the Kazakh power grid. Pouyanné expressed his gratitude to the Kazakh authorities for their unwavering support and cooperation throughout the process, emphasizing that this achievement is a significant milestone in TotalEnergies' multi-energy strategy. With their expertise in managing large-scale projects, TotalEnergies is poised to ensure the success of the Mirny project.

The Mirny project, comprising approximately 200 turbines, stands as the largest wind energy initiative ever undertaken in Kazakhstan. Aligned with the goals of both the Kazakh and French authorities, this project will significantly contribute to Kazakhstan's target of sourcing 15% of its electricity from renewable sources by 2030. Moreover, it will result in the annual avoidance of approximately 3.5 million tons of CO2 emissions over the duration of the signed PPA.
voda
0
ESB & Ørsted Forge Partnership for Irish Offshore Wind

By Strategic Research Institute on Jun 14, 2023 10:38 am

ESB, Ireland's leading utility, and Ørsted, a global leader in offshore wind, have embarked on a groundbreaking partnership to jointly develop an extraordinary portfolio of offshore wind projects along the Irish coast. The historic agreement was officially launched at Fitzgerald House, hosted by the Cork Chamber, and witnessed the presence of Simon Coveney TD, the Minister for Enterprise, Trade & Employment, Jim Dollard from ESB, and Duncan Clark, Head of UK and Ireland at Ørsted.

This remarkable collaboration establishes Ørsted as an equal 50/50 partner in a pipeline of offshore wind development ventures. The partnership holds immense potential, aiming to deliver up to five gigawatts (GW) of renewable energy and complementary renewable hydrogen projects. The first of these ambitious offshore wind projects is expected to participate in the upcoming Irish offshore wind auction, known as ORESS 2.1.

Ireland, with a maritime area more than ten times its landmass, is uniquely positioned to cultivate a robust and dynamic offshore sector. This development will play a vital role in decarbonizing the Irish electricity system and facilitate future exports of renewable energy to Europe. The partnership also encompasses a commitment to explore opportunities in renewable hydrogen produced from these projects, contributing to Ireland's goal of achieving net-zero emissions by 2030.

Minister Simon Coveney TD expressed his enthusiasm for the partnership, stating, "The Irish Government is fully committed to fostering a thriving offshore wind sector, which will provide abundant clean and secure renewable energy. Our Climate Action Plan enshrines ambitious targets, including a 5 GW offshore wind goal by 2030 and generating 80% of our electricity from renewable sources. Today's announcement reflects strong confidence in Ireland's sustainable future and marks a significant milestone in building an indigenous energy system that is secure, affordable, and clean."

Jim Dollard, ESB Executive Director, Generation & Trading, highlighted the substantial progress made by ESB in offshore wind, collaborating with leading energy companies and establishing a substantial offshore footprint across Ireland and Great Britain. He emphasized ESB's commitment to developing a robust renewables pipeline and expressed delight in partnering with Ørsted, a global leader in offshore wind, to advance this portfolio in Ireland. Offshore wind will play a pivotal role in ESB's strategy, "Driven to Make A Difference - Net Zero by 2040," and this partnership marks a significant step in that journey.

Duncan Clark, Senior Vice President and Head of UK and Ireland at Ørsted, acknowledged the strong onshore portfolio already held by Ørsted in Ireland and expressed excitement about venturing into the Irish offshore market with ESB, a company that has played a vital role in bringing electricity to Ireland. This collaboration leverages complementary strengths and creates an ideal platform for Ørsted to bring its global expertise in offshore wind development to Ireland. Ørsted has been a driving force behind the commercialization of the offshore wind industry worldwide, and this partnership aligns with their vision of creating a world powered entirely by green energy, from the world's first offshore turbine to the largest operational offshore wind farm, Hornsea 2.
voda
0
Serbia offers 450 MW of wind, solar in maiden renewables auction

Serbia’s ministry of mining and energy on Wednesday launched a renewable energy auction, offering to award contracts for difference (CfDs) for 400 MW of wind and 50 MW of solar power.

It will be the first such auction for the Balkan country, which expects to award market premiums for 1,300 MW of renewables in the next three years as part of its incentives plan.

The ceiling price for this round is set at EUR 105 (USD 113.5) per MWh for wind power and EUR 90/MWh for solar. Bidders who offer the lowest price in relation to the ceiling will be prioritised, the ministry said.

The CfDs will be awarded for 15 years, the European Bank for Reconstruction and Development (EBRD), which supported the auction, said in a separate announcement. The reference price for calculating the premium is the price of electricity on Serbian power exchange market SEEPEX, the ministry added.

The proposed wind farms must have at least 3 MW of capacity. For solar, the minimum is 0.5 MW.

The last day to submit applications is August 14, 2023.

Technical assistance for the development of the legal and regulatory framework to facilitate renewable energy auctions was provided by the EBRD with funding support from the Swiss State Secretariat for Economic Affairs (SECO).

(EUR 1.0 = USD 1.081)

renewablesnow.com/news/serbia-offers-...
voda
0
Windpark Hollandse Kust Noord levert eerste groene stroom
Door THEO BESTEMAN

Gisteren, 18:11
in FINANCIEEL

AMSTERDAM - Het offshore windpark Hollandse Kust Noord heeft na tests maandag zijn eerste megawattuur aan groene energie voor Nederland geproduceerd. Via de TenneT-netkabel gaat de stroom van uiteindelijk 69 windturbines allereerst naar de industrie aan de kust.

www.telegraaf.nl/financieel/113682959...
voda
0
BP gaat in Duitsland twee offshore windparken bouwen

Eerste offshore windprojecten BP in Europa.

(ABM FN-Dow Jones) BP heeft de aanbesteding gewonnen om twee windmolenparken te mogen bouwen voor de Duitse kust. Dit meldde de Britse energiereus woensdag.

De twee locaties in de Noordzee liggen respectievelijk 130 en 150 kilometer voor de Duitse kust met een waterdiepte van ongeveer 40 meter. De twee parken samen zullen in de toekomst tot 4 GW kunnen opwekken.

BP zal de ontwikkeling, bouw en exploitatie van de windprojecten op zich nemen, met als doel om de windparken eind 2030 op het net aan te sluiten. Wel moet BP daarvoor nog bepaalde vergunningen en goedkeuringen ontvangen.

Door: ABM Financial News.

info@abmfn.nl

Redactie: +31(0)20 26 28 999
voda
0
World’s tallest wooden wind turbine is ‘stronger than steel’
Sweden's Modvion is using the strength of wood to harness the power of the wind

thenextweb.com/news/worlds-tallest-wo...
voda
0
Licht hogere omzet Vestas

Outlook voor boekjaar 2023 deels verhoogd.

(ABM FN) Vestas heeft in het tweede kwartaal van dit jaar een hogere omzet geboekt. Dit maakte de Deense producent van windturbines woensdagochtend bekend met de publicatie van de kwartaalcijfers.

De omzet steeg op jaarbasis van 3,3 naar 3,4 miljard euro.

De EBIT-verlies vóór bijzondere posten was 70 miljoen euro, resulterend in een EBIT-marge van 2,0 procent negatief, vergeleken met 5,5 procent negatief in het tweede kwartaal van 2022.

De vrije kasstroom bedroeg 140 miljoen euro negatief in vergelijking met 362 miljoen euro negatief in het tweede kwartaal van 2022.

Er werden 8 procent meer windturbines besteld, met een totaal waarde van 20 miljard euro op 30 juni 2023.

CEO Henrik Andersen gaf aan dat de vergunnings- en regelgevingsonzekerheid een belangrijke uitdaging blijft in de energietransitie.

Hoewel de verstoringen in de toeleveringsketen afnemen, verwacht hij dat deze zich in de tweede helft van het jaar zullen voortzetten.

Het wereldwijde zakelijke klimaat zal naar zijn mening uitdagend blijven voor de rest van 2023.

Vestas zegt zich volledig in te zetten om winstgevend te worden, aldus Andersen. In het afgelopen kwartaal kwam het verlies uit op 115 miljoen euro tegen 119 miljoen euro een jaar eerder.

Outlook

Het bedrijf mikt voor 2023 onverminderd op een omzet van 14,0 tot 15,5 miljard euro.

De verwachting is dat de omzet uit diensten nu met ongeveer 10 procent zal groeien, waar voorheen op minimaal 5 procent werd gerekend.

Vestas verwacht een EBIT-marge vóór bijzondere posten van 2 procent negatief tot 3 procent positief, met een EBIT-marge bij diensten van circa 22 procent.

Door: ABM Financial News.

pers@abmfn.be

Redactie: +32(0)78 486 481
voda
1
PERSBERICHT: Boskalis verwerft omvangrijke kabelcontracten voor Baltica 2 offshore windpark

Papendrecht, 5 september 2023

Boskalis heeft twee contracten verworven voor het transport en de installatie van export- en arraykabels voor het Baltica 2 offshore windpark voor de kust van Polen. De twee contracten hebben een gezamenlijke waarde die als groot wordt beschouwd(1) en zijn gegund door een joint venture tussen PGE Polska Grupa Energetyczna en Ørsted als ontwikkelaars van het Baltica 2 project.

Het project bestaat uit het transport en de installatie van 107 arraykabels met een totale lengte van meer dan 150 kilometer en vier 275 kV exportkabels met een gecombineerde lengte van bijna 300 kilometer. Daarnaast zal Boskalis voorbereidende activiteiten uitvoeren, waaronder het egaliseren van de zeebodem, het graven van sleuven en het verwijderen van grote zwerfkeien op de kabelroute. Na voltooiing van de kabelinstallatiewerkzaamheden zal Boskalis de kabels, die beschermd worden tegen beschadiging door middel van cable protection systems, stabiliseren en afdekken met stenen. De voorbereidende werkzaamheden starten in 2025 en de transport- en installatiewerkzaamheden vinden plaats in 2027.

Boskalis zal twee kabellegschepen, een construction support vessel (CSV), een subsea rock installation vessel en een sleephopperzuiger inzetten. Vanwege de uitdagende bodemgesteldheid in de Baltische Zee worden de kabels gelegd met behulp van de Megalodon-ploeg die vanaf de Boskalis CSV Falcon wordt ingezet.

Het Baltica 2 offshore windpark krijgt een capaciteit van 1,5 GW en bevindt zich in het Poolse deel van de Baltische Zee, circa 40 kilometer uit de kust van Polen tussen Leba en Ustka. Daarmee wordt dit het grootste duurzame energieproject van Polen.

De strategie van Boskalis is erop gericht in te spelen op belangrijke macro-economische factoren en de energietransitie te bevorderen. Met dit project en via zijn klant bevordert Boskalis de energietransitie door het beschikbaar maken van offshore duurzame energie.

(1) Een 'groot' contract is een contract met een waarde van meer dan EUR 300 miljoen.

VOOR MEER INFORMATIE

Martijn L.D. Schuttevâer

press@boskalis.com

T +31 786969310

Dit persbericht wordt ook in het Engels gepubliceerd; de Nederlandse versie zal prevaleren boven de Engelse versie.

Boskalis is een toonaangevende internationale dienstverlener op het gebied van baggeren, maritieme infrastructuur en maritieme diensten. De onderneming levert wereldwijd creatieve en innovatieve totaaloplossingen voor infrastructurele uitdagingen in maritieme gebieden, kuststreken en rivierdelta's. Met kernactiviteiten zoals kust- en oeverbescherming en landaanwinning kan Boskalis adaptieve en mitigerende oplossingen aanbieden ter bestrijding van de gevolgen van klimaatverandering, zoals extreme weersomstandigheden en de stijging van de zeespiegel, evenals oplossingen voor de toenemende behoefte aan ruimte in kust- en deltagebieden over de hele wereld. De onderneming faciliteert de ontwikkeling van offshore energie-infrastructuur, waaronder duurzame windenergie. Tevens is Boskalis actief in de aanleg en het onderhoud van havens, waterwegen, toegangskanalen en civiele infrastructuur waarmee bijgedragen wordt aan het faciliteren van handelsstromen en de sociaal-economische ontwikkeling van een regio. Boskalis is tevens een internationaal expert op het gebied van scheepsbergingen en heeft een strategisch partnership in terminaldiensten (Smit Lamnalco). Met een veelzijdige vloot van ruim 600 schepen en vaartuigen en circa 10.000 medewerkers, inclusief deelnemingen, is de onderneming wereldwijd actief met Creating New Horizons.

Dit persbericht is tevens opgenomen op onze website www.boskalis.com.

Bijlages

-- Ndurance2
ml-eu.globenewswire.com/Resource/Down...
voda
0
Duits plan: windmolens bouwen op terrein Tsjernobyl
Gisteren, 22:50i n FINANCIEEL

KYIV (ANP/DPA) - Een Duits windenergiebedrijf heeft plannen om windmolens te bouwen op het terrein van de oude kerncentrale bij Tsjernobyl in Oekraïne. Het bedrijf NOTUS energy heeft daarvoor een intentieverklaring ondertekend met het Oekraïense staatsenergiebedrijf Ukrenergo tijdens het bezoek van de Duitse minister van Buitenlandse Zaken aan Kyiv deze week.

Volgens NOTUS heeft het afgesloten gebied rond Tsjernobyl de potentie om windenergie te gaan leveren aan 800.000 huishoudens in Kyiv. Het bedrijf stelt met dat project te willen bijdragen aan de wederopbouw en de energiezekerheid van Oekraïne.

Voor meer, zie link

www.telegraaf.nl/financieel/497225492...
Joni-2
0
Volgens een @McKinsey_de -studie zal de #Klimaneutralität zich in 2045 meerdere keren terugverdienen.

Orsted hele bedrijf is al gericht op het beheren van #Klimakrise en we plukken nu al de vruchten van #Dekarbonisierung .

twitter.com/OrstedDE/status/170188342...
voda
0
Twijfel alom over investeren in turbines
THEO BESTEMAN

11 min geleden in COLUMNS

Koning Willem-Alexander negeert de regen, beklimt op het strand van IJmuiden een speciaal gebouwde toren en drukt bovenin op een knop. Dankbaar hard applaus klinkt. De koning haalt hiermee de eerste stroom van windmolenpark Hollandse Kust Zuid van Vattenfall, reikend van Zandvoort tot Den Haag, van achttien kilometer ver naar de kust. Die door windmolens opgewekte stroom, met wieken van honderd meter lengte die ik onlangs op zee nog opgetuigd zag worden, is goed om zo’n 1,5 miljoen huishoudens van elektriciteit te voorzien.

In een grote tent op het strand in de duinen voor Beach Inn is de spanning onder een paar honderd toegestroomde bestuurders en techneuten uit de Europese windsector voelbaar. Het zweet staat op de voorhoofden. Uit gesprekken op strand en binnen komt vrees naar voren: zal dit in Nederland voorlopig het laatste windpark met grote windturbines op zee zijn? Bestuurders zijn ronduit somber.

Voor meer, zie link:

www.telegraaf.nl/watuzegt/2072037308/...
voda
0
Meer betalen voor stroom om fors hogere kosten windparken op zee
KLEIS JAGER

Aangepast: Vandaag, 01:56 Gisteren, 19:46 in FINANCIEEL

AMSTERDAM - De kosten voor het aansluiten van windparken op de Noordzee zijn veel hoger dan gedacht. Demissionair klimaatminister Rob Jetten schat dat de rekening tientallen miljarden hoger zal uitvallen.

Nederlanders gaan meer betalen voor hun stroom, omdat de ambitieuze uitbreiding van windparken op zee fors duurder blijkt. Het probleem is vooral de kosten van kabels en laadstations die de zeestroom verspreiden over het land.

Voor meer, zie link:

www.telegraaf.nl/financieel/131336954...
[verwijderd]
0
quote:

voda schreef op 18 oktober 2023 08:02:

Meer betalen voor stroom om fors hogere kosten windparken op zee
KLEIS JAGER

Aangepast: Vandaag, 01:56 Gisteren, 19:46 in FINANCIEEL

AMSTERDAM - De kosten voor het aansluiten van windparken op de Noordzee zijn veel hoger dan gedacht. Demissionair klimaatminister Rob Jetten schat dat de rekening tientallen miljarden hoger zal uitvallen.

Nederlanders gaan meer betalen voor hun stroom, omdat de ambitieuze uitbreiding van windparken op zee fors duurder blijkt. Het probleem is vooral de kosten van kabels en laadstations die de zeestroom verspreiden over het land.

Voor meer, zie link:

www.telegraaf.nl/financieel/131336954...
Waar is de rekening in te zien?
Ik herinner me dat het eerder/vroeger ging over "Stopcontact op zee".
Toentertijd heb ik geconcludeerd dat de infrastructuur voor zee-windenergie zoals kabels en aansluitstations ongeveer even duur waren als de windmolens zelf. ***)
Die infrastructuur betaalt de Overheid, niet de windmolen exploitanten.
Ik neem aan dat dit bedoeld wordt met "aansluitkosten".

***)Dus was windenergie van zee al 2x zo duur dan ons destijds wijs werd gemaakt.

Och gut, en de windmolen fabrikanten klagen ook al dat hun kosten 30% zijn gestegen.
2.053 Posts, Pagina: « 1 2 3 4 5 6 ... 97 98 99 100 101 102 103 » | Laatste
Aantal posts per pagina:  20 50 100 | Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met uw e-mailadres en wachtwoord.

Direct naar Forum

Markt vandaag

 AEX
882,63  +12,36  +1,42%  26 apr
 Germany40^ 18.177,90 +1,45%
 BEL 20 3.874,87 +0,44%
 Europe50^ 5.011,70 +0,10%
 US30^ 38.211,61 0,00%
 Nasd100^ 17.698,09 0,00%
 US500^ 5.095,29 0,00%
 Japan225^ 38.345,55 0,00%
 Gold spot 2.337,95 0,00%
 EUR/USD 1,0693 -0,34%
 WTI 83,64 0,00%
#/^ Index indications calculated real time, zie disclaimer

Stijgers

EBUSCO HOLDING +9,33%
NX FILTRATION +8,77%
ASMI +7,26%
Alfen N.V. +5,89%
PostNL +3,82%

Dalers

SIGNIFY NV -11,28%
Wereldhave -7,62%
AMG Critical ... -5,77%
IMCD -4,90%
ABN AMRO BANK... -4,19%